Technical Name | Global Navigation Satellite System - Reflectometry | ||
---|---|---|---|
Project Operator | National Applied Research Labroratories | ||
Project Host | - | ||
Summary | The GNSS-R instrument development is based on in-house GPSR technologies. Airborne flight tests with a prototype was conducted to verify system designperformance in 2016. An engineering model is now ready for integration on FS-7R satellite engineering development model (EDM). The FS-7R is expected to be launched in 2019. |
||
Scientific Breakthrough | - |
||
Industrial Applicability | - |
||
Keyword |